scion Workshop Repair Guides

Scion Workshop Service and Repair Manuals

Cooling System > < Water Pump|Specifications|Page 1577
Page 3
background image

b. Apply a continuous bead of seal packing (diameter 2.2 to 2.5 mm (0.09 to 0.10 inch)) as shown in the illustration.

Seal packing: Part No. 08826-00080 or equivalent

NOTICE:  
-

Remove any oil from the contact surface.

-

The parts must be set within 3 minutes and must be assembled within 15 minutes after applying seal packing. Otherwise, the material must
be removed and reapplied.

c. Install the water pump and clamp bracket with the 4 bolts and 2 nuts.

Torque: 9.0 Nm (92 kgf-cm, 80 inch lbs.) 

d. Install the wire of the crankshaft position sensor onto the clamp bracket.
e. Install the clamp of the crankshaft position sensor onto the water pump.

10. INSTALL WATER PUMP PULLEY

a. Using SST, install the water pump pulley with the 4 bolts.

SST 09960-10010 (09962-01000, 09963-00700)
Torque: 26 Nm (265 kgf-cm, 19 ft. lbs.) 

11. INSTALL GENERATOR ASSEMBLY 
12. INSTALL FAN AND GENERATOR V-BELT 

SST 09249-63010

13. ADD ENGINE COOLANT
14. INSTALL BATTERY NEGATIVE TERMINAL

Torque: 5.4 Nm (55 kgf-cm, 48 inch lbs.) 

15. CHECK FOR ENGINE COOLANT LEAKAGE
16. INSTALL ENGINE UNDER COVER RH
17. INSTALL FRONT FENDER APRON SEAL RH

Cooling System > < Water Pump|Specifications|Page 1577