tC L4-2.4L (2AZ-FE) (2005)
c. Install a new gasket onto the exhaust pipe front.
d. Install the exhaust pipe center into the 2 exhaust pipe supports No. 4.
e. Tighten the 2 compression springs and 4 bolts.
Torque: 43 N.m (440 kgf.cm, 32 ft.lbf)
33. ADD FUEL
34. INSTALL FUEL SUCTION W/ PUMP & GAUGE TUBE ASSEMBLY
35. CONNECT BATTERY NEGATIVE TERMINAL
Torque: 5.4 N.m (55 kgf.cm, 48 in.lbf)
36. CHECK FOR FUEL LEAKAGE
37. CHECK FOR EXHAUST GAS LEAKAGE
38. INSTALL FLOOR PANEL BRACE FRONT
39. INSTALL REAR FLOOR SERVICE HOLE COVER
40. INSTALL RR SEAT CUSHION ASSEMBLY