scion Workshop Repair Guides

Scion Workshop Service and Repair Manuals

Electrical - Multiple Warning Lamps/No Shift From Park|Page 283 > < Electrical - Multiple Warning Lamps/No Shift From Park|Page 281
Page 1
background image

Main Relay (Computer/Fuel System): Testing and Inspection

INSPECT CIRCUIT OPENING RELAY 

a. Check the resistance.

1. Using an ohmmeter, measure the resistance between the terminals.

If the result is not as specified, replace the instrument panel junction block

INSPECT MAIN RELAY 

Electrical - Multiple Warning Lamps/No Shift From Park|Page 283 > < Electrical - Multiple Warning Lamps/No Shift From Park|Page 281