tC L4-2.4L (2AZ-FE) (2005)
6. INSTALL TRANSMISSION CONTROL CABLE ASSEMBLY
a. Put in the control cable to the body.
b. Install the shift cable grommet retainer No.2 to the floor shift cable.
c. Install the floor shift cable as shown in the illustration.
HINT: Securely engage the claws.
d. Install the shift cable grommet retainer No.2 with the 2 bolts.
Torque: 5.0 Nm (50 kgf-cm, 43 inch lbs.)
7. CONNECT TRANSMISSION CONTROL CABLE ASSEMBLY
a. Connect the control cable to the control cable clamp.
b. Connect the control cable with the clip to the bracket.