tC L4-2.4L (2AZ-FE) (2005)
e. Connect the control cable assembly to the transaxle, and install the 2 washers and 2 clips.
12. CONNECT TRANSMISSION CONTROL CABLE ASSEMBLY
a. Connect the ends of the control cable assembly and install the 2 clips to the shift lever assembly.
b. Turn the lock nuts of the shift cable 270 degrees counterclockwise, and hold them.
c. Install the shift cable while holding the lock nuts.
d. Check that the cables are installed securely.
e. Push in the cable locks of the shift cable and select cable.
13. INSTALL FRONT FLOOR HEAT INSULATOR NO.1
Torque: 5.5 Nm (56 kgf-cm, 49 inch lbs.)
14. INSTALL EXHAUST PIPE ASSEMBLY
15. INSTALL AIR BAG SENSOR ASSEMBLY CENTER
16. INSTALL AIR CONDITIONER UNIT ASSEMBLY
17. INSTALL CONSOLE BOX ASSEMBLY REAR
18. INSTALL CONSOLE UPPER REAR PANEL SUB-ASSEMBLY
19. INSTALL CONSOLE PANEL UPPER
20. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY