xA L4-1.5L (1NZ-FE) (2006)
9. CHECK REAR BRAKE DRUM INSTALLATION
10. INSTALL REAR BRAKE DRUM SUB-ASSEMBLY
11. ADJUST REAR BRAKE DRUM SHOE CLEARANCE
12. INSTALL REAR WHEEL
Torque: 103 Nm (1,050 kgf-cm, 76 ft. lbs.)
13. INSTALL FRONT NO. 2 FLOOR HEAT INSULATOR
a) Install the heat insulator with the 3 bolts.
Torque: 5.5 Nm (55 kgf-cm, 48 inch lbs.)
14. INSTALL FRONT EXHAUST PIPE ASSEMBLY
15. INSTALL FRONT FLOOR PANEL BRACE
a) Install the floor panel brace with the 2 bolts.
16. TEMPORARILY TIGHTEN NO. 1 WIRE ADJUSTING NUT
a) Temporarily tighten the wire adjusting nut.
17. CHECK PARKING BRAKE LEVER TRAVEL
18. ADJUST PARKING BRAKE LEVER TRAVEL
19. INSTALL REAR CONSOLE BOX ASSEMBLY
20. INSTALL CONSOLE BOX CARPET
21. INSTALL REAR CONSOLE BOX COVER
22. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY (for Manual Transaxle)
23. CHECK EXHAUST GAS LEAKAGE