xB L4-2.4L (2AZ-FE) (2009)
![background image](/scion/xb/l4-2.4l_(2az-fe)/Page-1874002.png)
5. INSTALL ROOF HEADLINING PAD RH
(a) Install the 8 double-sided tapes.
(b) Align the roof headlining pad with the markings on the roof headlining and install it onto the roof headlining.
6. INSTALL ROOF HEADLINING PAD LH
(a) Install the 8 double-sided tapes.
(b) Align the roof headlining pad with the markings on the roof headlining and install it onto the roof headlining.
7. INSTALL NO. 1 ROOF SILENCER PAD
(a) Install the 5 double-sided tapes.
(b) Align the 5 No. 1 roof silencer pads with the markings on the roof headlining and install them onto the roof headlining.
8. INSTALL NO. 3 ROOF PANEL PAD