xB L4-2.4L (2AZ-FE) (2009)
(a) Install the relay block and with the 2 screws.
14. INSTALL NO. 1 AIR DUCT SUB-ASSEMBLY
(a) Install the air duct with the 2 nuts.
Torque: 9.8 Nm (100 kgf-cm, 87 in-lbf)
15. INSTALL CENTER INSTRUMENT PANEL TO COWL BRACE
(a) Install the center instrument panel to cowl brace with the 2 bolts.
16. INSTALL LOWER DEFROSTER NOZZLE ASSEMBLY
(a) Engage the 6 claws and install the lower defroster nozzle.
17. INSTALL REAR NO. 1 AIR DUCT