xD L4-1.8L (2ZR-FE) (2008)
(a) Connect the 3 connectors and clamp.
(b) Engage the 4 clips and install the air conditioning panel.
5. INSTALL INSTRUMENT CLUSTER FINISH CENTER PANEL SUB-ASSEMBLY See: Body and Frame/Interior Moulding / Trim/Dashboard /
Instrument Panel/Service and Repair/Upper Instrument Panel/Installation