xD L4-1.8L (2ZR-FE) (2008)
7. INSTALL NO. 2 AIR DUCT
(a) Engage the 3 claws and install the air duct.
8. INSTALL NO. 1 AIR DUCT
(a) Engage the 3 claws and install the air duct.
9. INSTALL AIR MIX DAMPER CONTROL CABLE SUB-ASSEMBLY
(a) Engage the claw and install the air mix damper control cable.
10. INSTALL DEFROSTER DAMPER CONTROL CABLE SUB-ASSEMBLY
(a) Engage the claw and install the defroster damper control cable.
Installation
AIR CONDITIONING: AIR CONDITIONING UNIT: INSTALLATION
INSTALLATION