scion Workshop Repair Guides

Scion Workshop Service and Repair Manuals

Relays and Modules - Starting and Charging > < Components|Page 4753
Page 2
background image

(i) Using a screwdriver, stake the nut with the lock plate.

(j) Install the control shaft lever with the nut and washer.

Torque: 13 Nm (129 kgf-cm, 9 ft-lbf)

(k) Connect the connector to the park/neutral position switch assembly.

2. INSTALL TRANSMISSION CONTROL CABLE ASSEMBLY

(a) Install the transmission control cable assembly onto the control shaft lever with the nut.

Torque: 12 Nm (122 kgf-cm, 9 ft-lbf)

(b) Fix the transmission control cable assembly onto the control cable bracket with a new clip.

NOTE: Make sure that the marking on the cable is aligned with the slit in the transmission control cable bracket before installing the cable.

3. INSPECT SHIFT LEVER POSITION 

                 

4. INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY See: Testing and Inspection/On-Vehicle Inspection

                 

5. INSTALL ENGINE UNDER COVER LH

Torque: 5.0 Nm (51 kgf-cm, 44 in-lbf)

Relays and Modules - Starting and Charging > < Components|Page 4753