Leon Mk1
Fitting notes | |
Parameter for bonding procedure: | |
Body temperature | min. 35 ℃ |
Curing time for body after bonding | Min. 3.5 hours at workshop temperature |
Cleaning bonding surfaces | |
Cleaning with | Mixture of isopropanol/water (50:50), pure isopropanol as alternative |
Use new rag on each side. Evaporation time | |
Evaporation time | Min. 1 minute, max. 24 hours |
Press on adhesive tapes with roller | 35 N/cm2 |
Force applied to bonding surface | Min. 24 hours after assembly. |