–
| Undo the bolt -2- and remove the clamping element -1- of the Poly V-belt. |
Installation is carried out in the reverse order; note the following: |
Tightening torque of the Poly V-belt clamping element: 23 Nm |
Bolt tightening torque of the air duct pipe = 9 Nm. |
|
|
|