Supercharger air system with turbocharger: check |
Note t
| All of the hose connections should be well secured |
t
| The supercharger air system should not leak |
t
| Renew self-locking nuts. |
t
| Fill the turbocharger using engine oil, for the connection junction before tightening the oil feed tube. |
t
| Following the fitting of the turbocharger, start the engine and let it idle for about 1 minute without accelerating. In this way, lubrication of the turbocharger is guaranteed. |
t
| Fitting hose connections with plug-in connectors → Chapter |
t
| Exhaust gas turbocharger : Assembly overview → Chapter |
t
| Removing and installing turbocharger → Chapter. |
t
| Components of the exhaust system: Assembly overview → Chapter |
t
| Removing and installing charge air cooler → Chapter |
t
| Supercharger system: checking for leaks → Chapter |
|
|
|