subaru Workshop Repair Guides

Subaru Workshop Service and Repair Manuals

Power Steering Line/Hose|Specifications|Page 3805 > < Power Steering Line/Hose|Specifications|Page 3803
Page 3
background image

3. Temporarily connect pipes C and D to pipes (on the gearbox side).
4. Temporarily install clamp E on pipes C and D.

CAUTION:  Ensure that the "8" letter side of clamp E is on the pipe C side.

5. Tighten joint nut. Tightening torque: 15 ± 5 Nm (10.81 ± 3.6 ft. lbs.).
6. Tighten clamp E firmly. Tightening torque: 5.4 ± 1.5 Nm (4.0 ± 1.1 ft. lbs.).

7. Connect pipes A and B to four pipe joints of gearbox. Connect upper pipe B first, and lower pipe A second. Tightening torque: 13 ± 3 Nm (9.4 ±

2.2 ft. lbs.).

8. Install jack-up plate.
9. Connect battery minus terminal.

10. Feed the specified fluid and discharge air.

NOTE:  Never start the engine before feeding the fluid; otherwise vane pump might be seized up.

Power Steering Line/Hose|Specifications|Page 3805 > < Power Steering Line/Hose|Specifications|Page 3803