subaru Workshop Repair Guides

Subaru Workshop Service and Repair Manuals

Exploded Views|Page 1908 > < Exploded Views|Page 1906
Page 1
background image

Pulsed Air Control Solenoid Valve: Testing and Inspection

CHECK INPUT SIGNAL FOR ECM 

Input Signal

1.

Turn ignition ON.

2.

Measure voltage between ECM connector terminal and body.

Connector & Terminal

Voltage

(E31) 3 - body

10 Volts minimum 

CHECK AIR SUCTION SOLENOID VALVE 

Resistance Test

1.

Turn ignition OFF.

2.

Unplug connector from solenoid valve.

3.

Measure resistance between solenoid valve terminals.

Terminals

Resistance

No. 1 - 2

36 Ohms at 20°C (68°F)

CHECK POWER SUPPLY TO AIR SUCTION SOLENOID VALVE 

Voltage Test

1.

Turn ignition ON.

2.

Measure voltage between solenoid valve connector and body.

Connector & Terminal

Voltage

(E3) 1 - body

10 Volts minimum 

Exploded Views|Page 1908 > < Exploded Views|Page 1906