Impreza GT F4-2.5L Turbo (2009)
Gear Sensor/Switch: Service and Repair
Installation
INSTALLATION
BACK-UP LIGHT SWITCH & NEUTRAL POSITION SWITCH
1) Install the back-up light switch & neutral position switch with the harness.
Tightening torque:
32.3 N-m (3.3 kgf-m, 23.8 ft-lb)
2) Connect the connectors of back-up light switch & neutral position switch.
3) Install the air intake chamber and intake boot.
(Non-turbo model)
4) Install the intercooler.
(Turbo model)
5) Connect the battery ground cable to the battery.