Impreza GT F4-2.5L Turbo (2009)
Tightening torque:
T1: 25 N-m (2.5 kgf-m, 18.4 ft-lb)
T2: 40 N-m (4.1 kgf-m, 29.5 ft-lb)
T3: 45 N-m (4.6 kgf-m, 33.2 ft-lb)
9) Install the transmission rear crossmember bolt.
Tightening torque:
70 N-m (7.1 kgf-m, 51.6 ft-lb)
10) Install the propeller shaft.
11) Install the heat shield cover.
12) Install the front, center and rear exhaust pipes, and the muffler. (Non-turbo model)
13) Install the center, rear exhaust pipes and the muffler. (Turbo model)
14) Lower the vehicle.
15) Install the transmission harness connector to the stay.
16) Install the pitching stopper.
17) Install the air intake chamber. (Non-turbo model)
18) Install the intercooler. (Turbo model)
19) Fill with the same amount of ATF as drained.
20) Bleed the air of control valve.
21) Inspect the level of ATF.
22) Perform learning control promotion. See: Testing and Inspection/Programming and Relearning