subaru Workshop Repair Guides

Subaru Workshop Service and Repair Manuals

Duty Solenoid C and Transfer Valve Body|Page 2471 > < Duty Solenoid C and Transfer Valve Body|Page 2469
Page 3
background image

2. Install solenoid valves. Shift solenoid assembly, and duty solenoid A (line pressure).

a length: 16 mm (0.63 inch) 
b length: 27 mm (1.06 inch) 

Tightening torque: 8 +/- 1 Nm (69 +/- 8 inch lbs.)

3. Install valve body and two brackets.

Tightening torque: 8 +/- 1 Nm (69 +/- 8 inch lbs.)

NOTE:  
-

Secure accumulator springs using Vaseline.

-

Align manual valve connections.

4. Install oil strainer.

Also install oil pipe and harness connector bracket.

Tightening torque: 8 +/- 1 Nm (69 +/- 8 inch lbs.)

5. Connect harness connectors at 4 places. Connect connectors of same color, and secure connectors to valve body using clips.

Duty Solenoid C and Transfer Valve Body|Page 2471 > < Duty Solenoid C and Transfer Valve Body|Page 2469