subaru Workshop Repair Guides

Subaru Workshop Service and Repair Manuals

Duty Solenoid A|Page 3172 > < Duty Solenoid A|Page 3170
Page 1
background image

Valve Body: Testing and Inspection
Shift Solenoid 1

MEASURE TCM VOLTAGE OUTPUT SIGNAL

Measure TCM Signal Voltage Output

1.

Raise vehicle and support with safety stands.

CAUTION: On AWD models, raise all wheels off ground.

2.

Warm up engine and transmission.

3.

Move shift lever to "D."

4.

Measure signal voltage output from TCM while idling the engine.

Connector & Terminal

Specified voltage

(B52) 10 - 13

10 V, min.

CHECK HARNESS AND CONNECTORS BETWEEN TCM AND SHIFT SOLENOID 1

Check Harness And Connectors Between TCM And Shift Solenoid 1

1.

Unplug connector from TCM.

2.

Unplug connector from transmission.

3.

Measure resistance between TCM connector and transmission connector, and between TCM connector and body.

Connector & Terminal

Resistance

(B52) 10 - (B9) 3

0 ohms

(B52) 10 - body

1 M ohm, min.

(B52) 13 - (B9) 4

0 ohms

(B52) 13 - body

1 M ohm, min.

CHECK SHIFT SOLENOID 1 GROUND LINE

Duty Solenoid A|Page 3172 > < Duty Solenoid A|Page 3170