subaru Workshop Repair Guides

Subaru Workshop Service and Repair Manuals

Intake Manifold|Removal and Installation|Page 1557 > < Intake Manifold|Removal and Installation|Page 1555
Page 13
background image

1. Install the intake manifold to tumble generator assembly.

NOTE:  Use a new gasket.

CAUTION:  This work should be done on cylinder head. (Do not use gasket for the mating surface of cylinder head and intake manifold at this
time.

1. Temporarily tighten (a) - (b) in alphabetical order.
2. Tighten (e) - (k) to 5 N.m (0.5 kgf-m, 4 ft-lb).
3. Tighten (a) - (d) and (l) - (o) to 10 N.m (1.0 kgf-m, 7 ft-lb).
4. Tighten (e) - (g) to 25 N.m (2.6 kgf-m, 18 ft-lb).
5. Tighten (h) - (k) to 25 N.m (2.6 kgf-m, 18 ft-lb).
6. Loosen (a) - (d) and (l) - (o) to remove.

2. Tighten the bolt which installs pressure regulator on intake manifold.

Tightening torque:  5 N.m (0.5 kgf-m, 3.6 ft-lb)

3. Tighten the bolt which installs the fuel pipes on intake manifold.

Intake Manifold|Removal and Installation|Page 1557 > < Intake Manifold|Removal and Installation|Page 1555