Outback F4-2.5L SOHC (2005)
![background image](/subaru/outback/f4-2.5l_sohc/Page-1431005.png)
7. REAR BEARING
Check the rear bearing, and replace the rear bearing if there are damage, lock or rust.
8. PLANETARY GEAR BUSHING
Measure the outer diameter (A) of pin which is press-fitted into shaft.
Then, measure the inner diameter (B) of planetary gear bushing, and calculate the clearance.
If it exceeds the service limit, replace the planetary gear or shaft.
9. SWITCH ASSEMBLY OPERATION
NOTE: Test period of each test must be within short time (3 - 5 seconds).
1. Vacuum test
Disconnect the harness from terminal M and connect it as shown in the figure. Make sure the pinion gear sticks out.