Outback F6-3.0L (2003)
4. Install air assist and purge pipe assembly.
Tightening torque: 5.0 N.m (0.51 kgf-m, 3.7 ft-lb)
5. Install PCV pipe to intake manifold.
Tightening torque: 6.4 N.m (0.65 kgf-m, 4.7 ft-lb)
6. Install engine harness assembly to intake manifold.
Tightening torque: 5.0 N.m (0.51 kgf-m, 3.7 ft-lb)
7. Install EGR valve.
Tightening torque: 19 N.m (1.9 kgf-m, 14 ft-lb)
8. Connect connector to EGR valve.