Outback F6-3.0L DOHC (2006)
INSTALLATION
1. Check the control valve body for dust and other foreign matters.
2. Install the control valve body to transmission by equally tightening the bolts.
Tightening torque: 8 Nm (0.8 kgf-cm, 5.8 ft. lbs.)
3. Connect the control valve connector.
4. Attach the magnet at the specified position of oil pan.
5. Apply liquid gasket to the oil pan.
Liquid gasket: THREE BOND 1217B (Part No. K0877YA020)
6. Install the oil pan by equally tightening the bolts.