XT-6 4WD L6-2.7L SOHC (1988)
FIGURE 7
1.
Align the center of the stake on the slide with the center of the two pulleys on the rail assembly. See Figure 7.
FIGURE 8
2.
Attach a spring scale to the cable directly across from the spring holder. See Figure 8.