suzuki Workshop Repair Guides

Suzuki Workshop Service and Repair Manuals

Valve, Intake/Exhaust|Specifications|Page 1245 > < Valve, Intake/Exhaust|Specifications|Page 1243
Page 6
background image

d) Tighten all bolts to 53 Nm (5.3 kgf-cm, 38.5 ft. lbs.).
e) In the same manner as in step b), retighten them to specified torque.

Tightening torque
Cylinder head bolts (a): 105 Nm (10.5 kgf-cm, 76.0 ft. lbs.) 
Cylinder head bolt (hex hole bolt) (b): 11 Nm (1.1 kgf-cm, 8.0 ft. lbs.) 

NOTE:  Be sure to tighten M8 bolt (3) after securing other bolts.

6) Install engine RH mounting bracket (1).

Tighten bracket bolts to specified torque.
Tightening torque
Engine RH mounting bracket bolts (a): 55 Nm (5.5 kgf-cm, 40.0 ft. lbs.) 

7) Install P/S pump bracket.
8) Install camshafts and valve lash adjuster. 
9) Install 1st timing chain. 

10) Install 2nd timing chain. 
11) Install timing chain cover. 
12) Install engine assembly to vehicle.

Valves and Cylinder Head Disassembly and Assembly 

Disassembly 
1) When servicing cylinder head, remove intake manifold, injectors, exhaust manifold and water outlet cap from cylinder head.

Valve, Intake/Exhaust|Specifications|Page 1245 > < Valve, Intake/Exhaust|Specifications|Page 1243