suzuki Workshop Repair Guides

Suzuki Workshop Service and Repair Manuals

Relays and Modules - Restraint Systems > < ECM Power and Ground Circuit Check|Page 135
Page 1
background image

Main Relay (Computer/Fuel System): Testing and Inspection
Main Relay Inspection

Main Relay Inspection

1. Disconnect negative cable at battery.

2. Remove main relay (1) from relay box (2).

3. Check resistance between each two terminals as follows. If check results are as specified, proceed to next operation check. If not, replace.

Main relay resistance
Between terminals "A" and "B": (Infinity)
Between terminals "C" and "C": 160 - 240 Ohms

4. Check that there is continuity between terminals "A" and "B" when battery is connected to terminals "C" and "D".

If found defective, replace.

Relays and Modules - Restraint Systems > < ECM Power and Ground Circuit Check|Page 135