Workshop Repair Manuals

Suzuki Workshop Manuals

[PREV PAGE] [NEXT PAGE]

suzuki Workshop Repair Guides


Equator 2WD V6-4.0L (2009)

Transmission and Drivetrain > Differential Assembly > Seals and Gaskets, Differential > System Information > Service and Repair > Rear Differential (C200 Type) > Page 2648

Page 6
background image

equal to the measurement taken during removal plus an additional 0.56 Nm (0.06 Kg-m, 5 in-lb).

^

If the total preload torque is low, tighten the drive pinion lock nut in 6.8 Nm (0.69 Kg-m, 5ft-lb) increments until the total preload torque is
met.

CAUTION:
^

Do not reuse drive pinion lock nut or drive pinion lock nut washer.

^

Apply anti-corrosive oil to the threads of the drive pinion and the seating surface of the new drive pinion lock nut.

^

Adjust the drive pinion lock nut tightening torque to the lower limit first. Do not exceed the drive pinion lock nut specified torque. 

^

Do not loosen drive pinion lock nut to adjust the total preload torque. If the total preload torque exceeds the specifications, replace the
collapsible spacer and tighten it again to adjust. 

^

After adjustment, rotate drive pinion back and forth 2 to 3 times to check for unusual noise, rotation malfunction, and other
malfunctions.

4) Installation of the remaining components is in the reverse order of removal.

CAUTION:
Check the differential gear oil level after installation. 

Transmission and Drivetrain > Differential Assembly > Seals and Gaskets, Differential > System Information > Service and Repair > Rear Differential (C200 Type) > Page 2648

[PREV PAGE] [NEXT PAGE]