Workshop Repair Manuals

Suzuki Workshop Manuals

[PREV PAGE] [NEXT PAGE]

suzuki Workshop Repair Guides


Equator 2WD V6-4.0L (2009)

Transmission and Drivetrain > Drive Axles, Bearings and Joints > Axle Shaft Assembly > Component Information > Service and Repair > Rear (C200 Type) > Page 2711

Page 7
background image

NOTE:
Always replace the bearing ring retainer with a new one.

6) Select the correct size shim washer. 

^

Select the size of shim washer so that the installed snap ring to shim washer clearance is within specification.

Snap ring to shim washer clearance: 0.2 mm (0.008 in) or less

7) Install a new snap ring on the axle shaft. 

^

Do not over spread the snap ring when installing, measure the outer diameter of the snap ring after installation and replace if the snap ring
outer diameter exceeds specification.

Snap ring outer diameter installed: 47.5 mm (1.87 in) maximum

NOTE:
Always replace the snap ring with a new one.

8) Check the snap ring to shim washer clearance, repeat steps 7 and 8 as necessary until the installed snap ring to shim washer clearance is within

specification.

9) Perform break-in rotation of the wheel bearing. 

a) Rotate the wheel bearing in the forward direction for a minimum of 10 revolutions at 50-70 RPM.
b) Rotate the wheel bearing in the reverse direction for a minimum of 10 revolutions at 50-70 RPM.

10) Measure the rotational torque of the wheel bearing.

Rotational speed 8-12 RPM
Rotational torque 1.8 Nm (0.18 kg-m, 16 in-lb)

11) Inspect that the wheel bearing is free from axial play relative to the axle shaft.
12) Install a new ABS sensor rotor on the axle shaft using a suitable press.

Transmission and Drivetrain > Drive Axles, Bearings and Joints > Axle Shaft Assembly > Component Information > Service and Repair > Rear (C200 Type) > Page 2711

[PREV PAGE] [NEXT PAGE]