suzuki Workshop Repair Guides

Suzuki Workshop Service and Repair Manuals

With Advanced Air Bag|Page 4524 > < With Advanced Air Bag|Page 4522
Page 4
background image

c. Place deployment fixture (A) on ground.

Special Tool
(A): 09932-75041

d. Fill plastic reservoir in deployment fixture (A) with water or sand. This is necessary to provide sufficient stabilization of fixture during

deployment.

e. Attach side-air bag (inflator) module (1) in deployment fixture using mounting attachment, sleeve lock nut and washer (2).

NOTE:  Make sure that deploying direction faces as shown in the figure against mounting attachment.

-

For side curtain-air bag (inflator) module

a. Loosen nut (1) and remove bag (2) of side curtain-air bag (inflator) module.
b. Tie side curtain-air bag inflator (1) to tire (3) with wire harness (2) as shown.

Wire harness specifications
Stripped wire harness section 1.25 sq.mm (0.0019 sq.in) or more (Stripped wire harness diameter 1.25 mm (0.05 in.) or more)

CAUTION:  Make sure that wire harness is tight. It is very dangerous if looseness in wire harness results in side curtain-air bag inflator
flying off due to shock from inflator deploying.

NOTE:  Wind wire harness (2) around at least 3 times.

c. Clear space (5) on ground about 185 cm (6 ft) in diameter where side curtain-air bag (inflator) module (1) is set for deployment. Paved,

outdoor location where there is no activity is preferred. If outdoor location is not available, use space on shop floor where there is no
activity and sufficient ventilation is provided. Ensure no loose or flammable object exists within activation area.

With Advanced Air Bag|Page 4524 > < With Advanced Air Bag|Page 4522