Grand Vitara 2WD V6-2.7L (2006)
Installation
1. Install tie-rod end lock nut (3) and tie-rod end (4) to tie-rod (1). Tighten lock nut (3) to mark (2) on tie-rod thread.
2. Install tie-rod end (4) to knuckle (5). Tighten new tie-rod end nut (6) to specified torque.
3. After installing wheels, lower vehicle and tighten wheel nuts to specified torque.
Tightening torque
Wheel nut a: 100 Nm (10.0 kg-m, 72.5 ft. lbs.)
4. Check that proper amount of toe-in is obtained.
5. After confirming proper amount of toe-in, tighten tie-rod end lock nut to specified torque.