suzuki Workshop Repair Guides

Suzuki Workshop Service and Repair Manuals

M/T - Slips Out of 1st/2nd Gear on Acceleration|Page 3003 > < M/T - Slips Out of 1st/2nd Gear on Acceleration|Page 3001
Page 6
background image

9)

Clean mating surfaces of both front and rear cases, and uniformly apply sealant to front case (1) as shown in figure by such amount that its section
is 1.2 mm (0.047 in.) in diameter, and then mate it with rear case.

"A": Sealant 99000-31260 (SUZUKI Bond No.1217G)

11)

Apply thread lock cement to reverse shaft bolt (2), and tighten it.

"B": Thread lock cement 99000-32110 (Thread Lock Cement Super 1322)

Tightening torque
Reverse shaft bolt (b): 23 N.m (2.3 kgf-m, 17.0 lb-ft)

12)

Install back up light switch (3) referring to "Back Up Light Switch Removal and Installation".

13)

Apply grease to gear shift shaft balls (1) and locating springs (2), then install them.

Apply thread lock cement to gear shift locating bolts (3), and then tighten them.

"A": Grease 99000-25010 (SUZUKI Super Grease A)

"B": Thread lock cement 99000-32110 (Thread Lock Cement Super 1322)

M/T - Slips Out of 1st/2nd Gear on Acceleration|Page 3003 > < M/T - Slips Out of 1st/2nd Gear on Acceleration|Page 3001