suzuki Workshop Repair Guides

Suzuki Workshop Service and Repair Manuals

Advanced Air Bag|Page 5894 > < Advanced Air Bag|Page 5892
Page 6
background image

(A): 09932 75041

d. Fill plastic reservoir in deployment fixture (A) with water or sand. This is necessary to provide sufficient stabilization of fixture during

deployment.

e. Attach side-air bag (inflator) module (1) in deployment fixture using mounting attachment, sleeve lock nut and washer (2).

NOTE:  Make sure that deploying direction faces as shown in the figure against mounting attachment.

-

For side curtain-air bag (inflator) module
a. Loosen nut (1) and remove bag (2) of side curtain-air bag (inflator) module.

Advanced Air Bag|Page 5894 > < Advanced Air Bag|Page 5892