suzuki Workshop Repair Guides

Suzuki Workshop Service and Repair Manuals

1st Timing Chain and Chain Tensioner|Page 1075 > < 1st Timing Chain and Chain Tensioner|Page 1073
Page 5
background image

3. Install timing chain guide No.4 (1).

4. Check that knock-pins of intake and exhaust camshafts are aligned with match marks on cylinder head as shown in figure.

5. Install by aligning match marks (2) on yellow plate (1) of LH bank 2nd timing chain and idler sprocket No.2.
6. Install sprockets to intake and exhaust camshafts by aligning silver plate of LH bank 2nd timing chain, match marks on intake sprocket and exhaust

sprocket respectively.

CAUTION:  Do not turn camshaft more than necessary. If turned excessively, valve and piston may get damaged.

7. Install LH bank intake and exhaust camshaft timing sprockets. To install it, fit a spanner to hexagonal part at the center of camshaft to hold

stationary.

1st Timing Chain and Chain Tensioner|Page 1075 > < 1st Timing Chain and Chain Tensioner|Page 1073