suzuki Workshop Repair Guides

Suzuki Workshop Service and Repair Manuals

Torque Converter > < Select Cable|Page 2223
Page 1
background image

Shift Cable: Adjustments
A/T Throttle Cable

ADJUSTMENT 

1. Pull inner cable (3) by force of 2 N (0.2 kg, 0.45 lb) or less to be no slack of inner cable with A/T throttle cable (1) curved as shown in the figure.
2. Fix stopper (2) to inner cable (3) with clearance "c".

A/T throttle cable adjusting position (clearance "c") 0.8 - 1.5 mm (0.03 - 0.06 inch) 

(FOR G16/J20 ENGINES) 

a. Check clearance "c" of A/T throttle cable (1). If it is out of specifications, adjust it by turning cable adjusting nut (2).

A/T throttle cable adjusting position (clearance "c") 0.8 - 1.5 mm (0.03 - 0.06 inch) 

b. Tighten lock nut (3) securely.

(FOR H25 ENGINE) 
a. Warm up engine and transmission to normal operating temperature.
b. Make sure that accelerator cable is adjusted as specified.

c. With throttle valve closed, check clearance "c", which should be within the following specification, of A/T throttle cable (1).

If it is out of specification, adjust it by turning cable adjusting nut (2).
A/T throttle cable adjusting position (clearance "c") 0.8 - 1.5 mm (0.03 - 0.06 inch) 

d. Tighten lock nut (3) securely.

Torque Converter > < Select Cable|Page 2223