Kizashi AWD L4-2.4L (2010)
17. Check magnetic switch for operation.
Starting Motor Inspection
Starting Motor Inspection
Starting Motor Operation Check
CAUTION:
-
When connecting cables to battery for the operation check, give enough care not to make an accidental short.
-
Each test must be performed within 3 to 5 seconds to avoid burning of coil.
1. Perform pull-in test as follows.
a. Disconnect lead wire (3) from terminal "M" (2).
b. Connect battery to magnetic switch as shown in figure.
c. Check that plunger and pinion move outward.
If plunger and pinion do not move, replace magnetic switch.