suzuki Workshop Repair Guides

Suzuki Workshop Service and Repair Manuals

Intake Manifold|Specifications|Page 1113 > < Intake Manifold|Specifications|Page 1111
Page 4
background image

1. Install EVAP canister purge valve, EGR valve, IAC valve, EGR pipe and vacuum pipe to intake manifold. Use new gaskets if equipped.

2. Install new intake manifold gasket to cylinder head.
3. Install intake manifold.

Tighten bolts and nuts to specified torque.

Tightening Torque (a): 23 Nm (17.0 ft. lbs.)

4. Connect water pipe to intake manifold.

5. Install intake manifold front stiffener and rear stiffener.

Tighten bolts to specified torque.

Tightening Torque
(a): 50 Nm (36.5 ft. lbs.)
(b): 23 Nm (17.0 ft. lbs.)

6. Install throttle body to intake manifold with new gasket.

Tighten bolts and nuts to specified torque.

Intake Manifold|Specifications|Page 1113 > < Intake Manifold|Specifications|Page 1111