Sidekick Sport 2D JLX 4WD L4-1.8L (1998)
13. Install strut tower bar.
Tighten bolts and nuts to specified torque.
Tightening Torque (a): 25 Nm (18.0 ft. lbs.)
14. Check to ensure that all removed parts are back in place. Reinstall any necessary parts which have not been reinstalled.
15. Refill cooling system.
16. Connect negative cable at battery.
17. Finally, start engine and check for engine coolant leaks.