When removing upper valve body from lower one, be careful not to let four steel balls shown in figure fall off.

-

When assembling, install these four (4) steel balls in such in upper valve body as shown in figure.

-

Replace each gasket with new one. Make sure that new gasket is the same as old one before installation.

-

When installing each valve to valve body, use special care for proper installing direction.

-

Several of throttle valve rings are used at throttle valve in upper valve body. Be sure to install the same number of throttle valve rings as those
used before disassembly.

-

When installing lower valve body cover and gasket to lower valve body, tighten lower valve body bolts to specification.
Tightening Torque: 

For lower valve body cover bolts: 4 - 6 Nm (36-48 inch lbs.).

-

Tighten throttle valve cam bolt to specification.
Tightening Torque:

For cam bolt: 6 - 9 Nm (54-78 inch lbs.)

-

When installing upper valve body to lower one, install 16 upper valve body bolts and tighten them to specified torque.

1. Lightly install two reamer bolts (positioning bolts) to D.
2. Install all other 14 bolts.
3. Tighten four bolts (2) to specification.
4. Tighten eight bolts (3) to specification.
5. Tighten two bolts (4) and two reamer bolts (1) to specification.

Tightening Torque:

For upper valve body bolts: 5 - 6 Nm (48 inch lbs.)