suzuki Workshop Repair Guides

Suzuki Workshop Service and Repair Manuals

Valve Clearance|Specifications|Page 937 > < Valve Clearance|Specifications|Page 935
Page 1
background image

Valve Clearance: Adjustments

VALVE LASH (CLEARANCE) 

1. Remove negative cable at battery.
2. Remove cylinder head cover.

3. Remove engine under cover of right side from body.

4. Using special tool and wrench, turn crankshaft pulley clockwise until "V" mark (in white paint) on pulley aligns with "0" (zero) calibrated on

timing belt cover.
Special Tool

(A): 09919-16020

5. See if the rocker arms of No. 1 cylinder are off the respective cam lobes (of camshaft); if so, valves (1), (2), (5) and (7) in left figure are ready for

clearance checking and adjustment. Check valve lashes at valves (1), (2), (5) and (7). If the rocker arms of No. 4 cylinder are off the respective
cam lobes, check valve lashes at valves (3), (4), (6) and (8).

NOTE:   When checking valve clearance, insert thickness gauge between camshaft and cam-riding face of rocker arm.

Valve Clearance|Specifications|Page 937 > < Valve Clearance|Specifications|Page 935