suzuki Workshop Repair Guides

Suzuki Workshop Service and Repair Manuals

Engine Control Module > < Data Link Connector|Description and Operation
Page 1
background image

Electric Load Sensor: Description and Operation

Electric Load Signal

This signal is sent from each circuit of head & small (or clearance) lights, heater fan, stop light and rear window defogger.

ECM (PCM) uses it as one of the factors for controlling IAC valve.

Engine Control Module > < Data Link Connector|Description and Operation