SX4 2WD L4-2.0L (2007)
5. Check that there is no open, short or damage in special tools (deployment harness (A), adapter cable (B) and (C)). If any faulty condition is found,
do not use it and be sure to use new special tool. And connect adapter cable (B) or (C) to deployment harness (A) and lock connectors with lock
slider.
Special Tool
(A): 09932-75031
(B): 09932-78332
(C): 09932-76510
6. Short two deployment harness leads together by fully seating one banana plug into the other.
WARNING: Deployment harness (A) shall remain shorted and not be connected to 12 volts vehicle battery until you are ready to deploy
air bag (inflator) module or activate seat belt pretensioner.
7. Connect adapter cable (B) in series with deployment harness (A) to air bag (inflator) module or seat belt pretensioner as follows.
^
For driver air bag (inflator) module [A]:
Connect adapter cable (B) in series with deployment harness (A) and push adapter cable (B) connector to air bag (inflator) module connector
till click can be heard.