suzuki Workshop Repair Guides

Suzuki Workshop Service and Repair Manuals

EVAP Canister Purge Valve and Its Circuit Inspection|Page 2367 > < EVAP Canister Purge Valve and Its Circuit Inspection
Page 2
background image

iii. Turn ON ignition switch.

Using service wire, ground C01-13 terminal (1) circuit of special tool (valve ON: B ) and unground it (valve OFF: A).

2. Check purge valve (2) for operation and vacuum passage for clog when valve is switched ON and OFF by using SUZUKI scan tool or service

wire.
If check result is not satisfactory, check hoses, EVAP canister purge valve, wire harness and connections.

EVAP Canister Purge Valve and Its Circuit Inspection|Page 2367 > < EVAP Canister Purge Valve and Its Circuit Inspection