suzuki Workshop Repair Guides

Suzuki Workshop Service and Repair Manuals

Electrical Specifications|Page 1501 > < Electrical Specifications|Page 1499
Page 1
background image

Ignition Timing: Testing and Inspection

IGNITION TIMING CHECK AND ADJUSTMENT

NOTE:  Before starting engine, place transmission gear shift lever in "Neutral" (shift selector lever to "P" range for A/T model), and set parking brake.

1. Start engine and warm it up to normal operating temperature.
2. Make sure that all of electrical loads except ignition are switched off.
3. Check to be sure that idle speed is within specification.

4. Connect SUZUKI scan tool to DLC (1) with ignition switch OFF, restart engine and fix ignition timing by using fixed spark mode of SUZUKI

scan tool.

Special tool
(A): 09931 - 76011
(B): Mass storage cartridge
(C): 09931 - 76030

5. Set timing light to ignition harness for No.1 cylinder.

6. Using timing light, check that timing observed from viewpoint is within specification.

Electrical Specifications|Page 1501 > < Electrical Specifications|Page 1499