XL-7 2WD V6-2.7L (2004)
4. Apply grease to "A" indicated in figure.
5. Position boot properly in grooves of gear case and tie-rod. Check to ensure that boot is free from twist and dent.
6. Fasten boot with new clamp and clip securely.
Special tool
(A): 09943-55010
7. Install tie-rod end lock nut and tie-rod end to tie-rod. Position lock nut to marking (1) made in removal.
NOTE: When tie-rod was replaced, measure length "A" on removed tie-rod and use it on new replacement tie rod so as to position lock nut
properly.
8. Install steering gear case.
Removal and Installation
Removal
1. Take out fluid in P/S fluid reservoir with syringe or such.
2. Disconnect high pressure pipe (1) from steering gear box by removing union bolt (2).
NOTE: As fluid flows out of disconnected joints, put a receptacle under joints or a plug to pipe.
3. Disconnect low pressure hose (3) from steering gear box by removing clamp (5).
NOTE: As fluid flows out of disconnected joints, put a receptacle under joints or a plug to hose.
4. Remove steering lower shaft bolt (4).
1. Hoist vehicle and remove both right and left wheels.