XL-7 2WD V6-3.6L (2007)
4. Install the fuel injector sight shield cover ballstud.
Tightening torque
Tighten the fuel injector sight shield cover ball stud to 10 N-m (89 in. lbs.).
NOTE: The camshaft cover bolt grommet must be installed into the camshaft cover bolt hole before installing the camshaft cover bolt.
5. Install the NEW left camshaft cover bolt grommets.
Right Camshaft Cover
1. Install the NEW right spark plug shield tube coil seals using the J 5590 (1) and J-25254-A (2).