suzuki Workshop Repair Guides

Suzuki Workshop Service and Repair Manuals

Procedures|Page 14614 > < Procedures|Page 14612
Page 13
background image

12. Install the liquid line and evaporator outlet hose retainer plate nut to the TXV.

Tightening torque

Tighten the nut to 20 N.m (15 lb.ft).

13. Install the four battery box bolts to the inside of the battery box.

Tightening torque

Tighten the nut to 15 N.m (11 lb.ft).

14. Install the battery box bolt to the outside of the battery box.

Tightening torque

Tighten the nut to 10 N.m (89 lb.in).

Procedures|Page 14614 > < Procedures|Page 14612