XL-7 2WD V6-3.6L (2007)
12. Connect the HVAC module electrical connector to the I/P wire harness.
13. Install the center I/P duct to the instrument panel tie bar.
14. Install the center I/P duct retainers to the instrument panel tie bar.
15. Install the center floor air outlet by sliding forward onto the front floor air outlet then down and rearward over the rear floor air outlet.
16. Install the shift control bracket. Refer to [Shift Control Replacement] for the AF33-5 transaxle.