suzuki Workshop Repair Guides

Suzuki Workshop Service and Repair Manuals

Procedures|Page 3211 > < Procedures|Page 3209
Page 14
background image

15. Install the battery. Refer to [Battery Replacement].
16. Install the liquid line to the strut tower.
17. Install the liquid line nut to the strut tower.

Tightening torque

Tighten the nut to 9 N.m (80 lb.in).

18. Connect the harness and vent hose retainers to the liquid line.
19. Install the surge tank. Refer to [Surge Tank Replacement].
20. Install the washer container. Refer to [Washer Solvent Container Replacement].
21. Recharge the A/C system. Refer to [Refrigerant Recovery and Recharging].
22. Test the affected A/C joints for leaks using J 39400-A.

Evaporator Outlet Hose Replacement

Evaporator Outlet Hose Replacement

Procedures|Page 3211 > < Procedures|Page 3209