XL-7 2WD V6-3.6L (2007)
a. Place the SA9413NE or J 39401-B SIR Deployment Fixture (2) in the center of the cleared area.
b. Fill the deployment fixture with water or sand.
c. Using the proper nuts and bolts, mount the I/P module (1) to the deployment fixture (2), with the vinyl trim facing up.
d. Securely tighten all fasteners that hold the I/P module (1) to the deployment fixture (2).
10. When deploying a roof rail module, perform the following instructions: