suzuki Workshop Repair Guides

Suzuki Workshop Service and Repair Manuals

Inflator Module Handling and Scrapping|Page 14834 > < Inflator Module Handling and Scrapping|Page 14832
Page 4
background image

a. Place the SA9413NE or J 39401-B SIR Deployment Fixture (2) in the center of the cleared area.
b. Fill the deployment fixture with water or sand.
c. Using the proper nuts and bolts, mount the I/P module (1) to the deployment fixture (2), with the vinyl trim facing up.
d. Securely tighten all fasteners that hold the I/P module (1) to the deployment fixture (2).

10. When deploying a roof rail module, perform the following instructions:

Inflator Module Handling and Scrapping|Page 14834 > < Inflator Module Handling and Scrapping|Page 14832